Quick Find
Project summaries provide an overview of the scope and capability of Soil Conservation Service to provide environmental protection, rehabilitation and land management solutions for the public, private industry and government.
Transgrid Access Track Maintenance 2009-2012
Reconstruction and repair of vast system of TransGrid access tracks in Southern, Central and Metropolitan NSW.
Reconstruction and repair of vast system of TransGrid access tracks in Southern, Central and Metropolitan NSW.
Murray CMA Erosion design implementation
Design and construction of effective and efficient erosion control works to mitigate gully erosion, provide site stabilisation and sediment retention.
Design and construction of effective and efficient erosion control works to mitigate gully erosion, provide site stabilisation and sediment retention.
MR Ardlethan Tin Mine 2007-2008
Rehabilitation of alluvial tin open cut mining site at Ardlethan and return ladscape, disturbed by mining, back to that of surrounding countryside.
Rehabilitation of alluvial tin open cut mining site at Ardlethan and return ladscape, disturbed by mining, back to that of surrounding countryside.
DMM Beecroft Staircase 2009
The provision of safe access to the Outer Tubes fishing platform and headland, located on the northern side of Jervis Bay, for fishers and bush walkers and the protection of an area of significant indigenous heritage value.
The provision of safe access to the Outer Tubes fishing platform and headland, located on the northern side of Jervis Bay, for fishers and bush walkers and the protection of an area of significant indigenous heritage value.
Parkes Shire Council alleviate flooding 2007-2008
Construction of detention basins to withstand high intensity storm events to alleviate threat of flood damage to Parkes.
Construction of detention basins to withstand high intensity storm events to alleviate threat of flood damage to Parkes.
Xstrata Baal Bone Colliery Rehabilitation
Open cut mine rehabilitation at Baal Bone Colliery, near Lithgow. Approximately 120 hectares of land elevated to a stable state with increasing ecological function and approximately 2.5 km of the Ben Bullen Creek channel stabilised.
Open cut mine rehabilitation at Baal Bone Colliery, near Lithgow. Approximately 120 hectares of land elevated to a stable state with increasing ecological function and approximately 2.5 km of the Ben Bullen Creek channel stabilised.


